From a radar module to a certified product

A module grant does not certify the finished host. Check the rule part, the grant conditions and the host obligations before freezing the enclosure.

This chapter separates mandatory radio approval, mandatory product-behaviour rules and voluntary labels. It is an editorial reading of public rules and official module pages, not legal advice and not a certificate search on your behalf.

Start with the band and its rule part

In the United States, 57-64 GHz field disturbance sensors are assessed under FCC Part 15.255, while 24 GHz devices follow a different rule part. An intentional radiator goes through FCC certification under 47 CFR 2.907; the Supplier's Declaration of Conformity route only covers unintentional radiators. A radar transmitter is not an unintentional radiator.

In the European Union, the harmonised standard depends on the band: 60 GHz equipment is assessed against ETSI EN 302 567, 24 GHz automotive short-range radar against EN 302 858 (whose wideband automotive use was withdrawn in January 2022), and 77 GHz equipment against EN 302 264. A grant for one band says nothing about another.

Product-behaviour rules sit beside the radio rules

These obligations constrain the behaviour of the finished product, not the choice of radar chip.

Delegated Regulation (EU) 2022/30 applies from 1 August 2025 and activates RED article 3(3)(d), (e) and (f), with EN 18031-1, EN 18031-2 and EN 18031-3 as the harmonised standards. The UK PSTI regime has applied since 29 April 2024 and requires three security conditions plus a Statement of Compliance.

In practice that means no universal default passwords, a vulnerability disclosure process, a support period with a stated end date, and signed updates. Fitting a different module does not satisfy any of them.

EN 303 645 is an ETSI baseline standard. It is not a regulation, it is not a RED harmonised standard, and it does not give a presumption of conformity. Citing it as the market-access basis for the EU is a common misreading.

China type approval is its own process

SRRC type approval in China is separate from FCC certification. An FCC report does not replace it, because the test arrangement and the interpretation basis differ. Designing to one set of limits and then turning the transmit power down for the other is not a compliance strategy.

The Ai-Thinker Rd-03D page offers a fixed-frequency test guide, which is test guidance rather than a published certificate. Hi-Link says its 24 GHz design can pass FCC, CE and national spectrum rules; that is a design statement, not a grant number.

Modular approval reuse is conditional, not automatic

Reusing a module grant is possible when the host follows the grant conditions and keeps the approved antenna unchanged. If the module label is not visible in the finished product, the host has to carry a Contains FCC ID label. Changing the antenna or the enclosure can take the product outside the grant, so check the grant text before assuming reuse.

The opposite claim is also wrong: a finished host is not automatically required to retest everything. What has to be repeated depends on the grant conditions and on what the host changes.

None of the six modules in this directory publishes a certification number on its official page. The certification fields in our device profiles are empty. Seeed's kit pages list no FCC or RED certificate number, the DFRobot wiki lists no grant number, and the Ai-Thinker page lists no certificate. Ask the vendor for the certificate and the declaration of conformity for the exact model and antenna you intend to ship.

Voluntary labels are not market access

The U.S. Cyber Trust Mark is a voluntary label; the FCC was still seeking comment on the label design in October 2026, and holding or displaying it is not an admission requirement. Singapore's Cybersecurity Labelling Scheme is a four-level voluntary scheme, with Level 1 mandatory only for routers under telecommunications rules.

Do not put these in the same checklist as FCC certification, RED, PSTI or SRRC. They answer a different question.

A short pre-freeze sequence

  1. Fix the band, the antenna and the enclosure, because those decide which rule part and which grant conditions apply.
  2. Request the module grant, the declaration of conformity and the SRRC certificate for that exact revision.
  3. Map the product-behaviour obligations to firmware features and to a support-period statement.
  4. Only then decide whether a voluntary label adds anything for the target market.